Leave Your Message

ZGS series combined substation

Scope of application

ZGS Combined transformer (Commonly known as American box transformer),its structure  is" 品"type,transformer and high and low voltage equipment are closely connected as one, among them,three sides of the transformer exposed to the air,good heat dissipation conditions  and can be separated from high and low voltage equipment shell,easy maintenance.

The transformer adopts chip type oil tank,no oil pillow,fully enclosed S11 series oil immersed transformer,high and low voltage bushing,tap switch,oil level indicator,pressure release valve, oil release valve and so on are installed on the high voltage chamber body end plate,reasonable position,easy to observe and operate.
High voltage room,low voltage room between the steel plate separated,high voltage room,low  voltage room transformer is relatively independent,and maintain a complete box to change the whole,compact structure,small volume,lightweight.The power distribution switchgear is installed on the high and low voltage side.

    Installation conditions

    Air self-cooling
    Altitude:≤1000m;
    Environment temperature:The outdoor environment temperature is not higher than 40℃ and  not lower than-45 C:the monthly average temperature is not higher than 30℃ and the annual average temperature is not higher than 20℃;
    Relative humidity:At 25℃,the relative humidity of the air does not exceed 95%,and the average monthly temperature does not exceed 90%;
    Shockproof level:Horizontal acceleration is not greater than 0.3m/s²,vertical acceleration is not large 0.15m/s²
    Surrounding environment:Installation environment should be free from obvious pollution,explosive, corrosive gas and dust;
    Installation site:There should be no violent vibration and impact,and it is required to be installed on a cement platform or other smooth and solid platform;
    When the above conditions cannot meet the use requirements,the user shall negotiate with the manufacturer

    Product structure and characteristics

    Small size,compact structure,easy installation;
    Can be used for ring network,also can be used for terminal,reliable protection of personal safety; Low damage,low noise and superior performance;
    Low temperature rise,strong load capacity.
    High voltage interval
    The high voltage interval contains high pressure line inlet sleeve,load switch operating handle, non-excited pressure regulating tap switch,plug-in fuse,pressure release valve,oil temperature  gauge,oil level gauge,pressure gauge,oil filling hole,oil discharge valve,etc.
    Low voltage interval
    In the low voltage distribution cabinet,an intelligent under voltage controller is installed,which has the function of identifying the abnormal voltage of the substation low voltage bus.When the high-voltage one or two-phase fuse is blown and the substation low-voltage measurement voltage is abnormal,the controller sends out an action signal to make the circuit breaker trip.  When the three-phase voltage of the low voltage side is lower than 50%of the normal voltage, the controller does not send an action signal,so as to avoid the trip of 10kV high voltage line or power failure maintenance caused by all the low voltage switch trip.Can be installed according to user requirements with telemetry,remote communication function of comprehensive power distribution tester

    Basic construction

    Box substations should be installed on horizontal concrete countertops that are guaranteed to support their weight.Most of the weight of the box-type substation is concentrated in the rear of the box where the transformer body is installed.The front cabinet is mostly empty,relatively lightweight,so the back of the platform should be strong,can withstand the combined weight of the change,but also requires the front and back table flat (generally,it is not easy to do flat,can make the front side of the cabinet foundation slightly lower than the backside of the transformer body foundation,in place after the concrete closed),to ensure that the box installation is  stable.

    The size of the platform is shown in Figure(1)and(2)
    productsli9
    Technical requirements:
    ①The relevant dimensions participate in the combined dimensions;
    ②The surface of the concrete base should be smooth,and after the installation of the combined substation,the base should be sealed around with cement;
    ③The shape of the earthing bar and cable fixing bracket can be determined according to the actual situation;
    ④ Cable fixing frame and earthing bar should be embedded;
    ⑤ The location of the inlet and outlet cable holes shall be determined according to the specific situation;
    ⑥There must be no less than1.5m gap on the front of the switch after installation of the combination transformer to facilitate operation;
    ⑦ The earthing net can be made of 12-plated round steel or 30×4 galvanized flat steel,and the resistance of the earthing wire should meet the requirements of the power department.
    Note: The size of L,Wand H shall be determined according to the actual project configuration.

    Ordering instructions

    The following information should be provided when ordering:
    ① The full model number of the product includes the
    main circuit scheme number and the auxiliary circuit
    scheme number;
    ② Main circuit system combination sequence diagram;
    ③Installation layout diagram;
    ④Electrical schematic diagram of auxiliary circuit;
    ⑤ Voltage,current,time and other setting parameters
    in the circuit;
    ⑥Other special requirements not consistent with the
    normal use of the product.

    Model and meaning

    products4b6
    Voltage  grade
    Transformer rated capacity
    High-voltage wiring scheme 
    Performance level code
    Combined transformer

    Leave Your Message